Landguard Point – Warden’s Bungalow Extension Rebuild
The Warden’s bungalow adjacent to the radar tower has an existing extension built in WW2 which was in need of a major update.
The Warden’s bungalow adjacent to the radar tower has an existing extension built in WW2 which was in need of a major update.
Landguard Point in Felixstowe is a popular location for sea walks and is designated a SSSI area.
The Erwarton Beacon is located upstream of Harwich International Port on the River Stour and was beginning to become unserviceable due to corrosion.
The repainting of the radar tower and the replacement of the scanner in collaboration with HHA’s scanner supplier and radar consultant.
The Outer Pontoon is the final one to be refurbished at the Launch Jetty harbour.
During the winter in early 2022 a severe storm damaged two steel tubular piles at the Launch Jetty harbour which secured a large pontoon and…
During the winter in early 2022 a severe storm damaged two steel tubular piles at the Launch Jetty harbour which secured a large pontoon and…
We have undertaken a number of repair projects on this jetty which is owned and operated by HHA.
We have undertaken a lot of work over the last few years for this client in Clacton. For the majority of the works previously completed…
HHA wanted to improve safety within their basement workshop so planned to move the lathe and drill to a new location.
The hotel overlooks the River Crouch which is tidal and has had a deck over the river for decades. The existing deck had become unsafe…
Following a large amount of work for this client in 2021 we were asked to propose works to re-clad the scout hut and replace the…
These works for HHA were entirely developed and proposed by Amicus and approved by HHA over approx. 10 months including third party approvals.
HHA are collaborating with a local fisherman to bring lobsters back to the coast around Brightlingsea and Harwich.
At HHA’s maintenance service building and yard the concrete floor slabs were showing signs of deflection. We undertook an investigation inside and outside of the…
This was a challenging project due to the location within a park in Finchley with limited access on both sides. The existing 8m long x…
Following our successful completion of Phase 1 of the pier renovations we were contracted to install a new parapet to enable the client to open…
We were recommended to this client following our work at Shotley Pier. The works involved removing the old timber foundations of their beach hut and…
This contract took many months of planning to ensure that the radar facility for HHA was only down for a few days. The works were…
As part of our civil engineering term framework contract with HHA we were contracted to undertake a variety of projects at Landguard Point in Felixstowe.
We were contracted by Trinity House to replace the cable tray system under their pier in Harwich which had become corroded and was missing many…
This is another phase of repair works at Ha’Penny Pier which we have been involved with since 2017. This phase concentrated on the entrance area…
Following a competitive tender process we were awarded this project to extend the existing slipway using hardwood timber piles and frame with a GRP deck…
We were engaged by the Sea Scout group to construct a new reinforced concrete slab for a new boat shed and to concrete the rest…
Following our successful completion of Phases 1 and 2 we were awarded Phase 3 works which included more concrete slabs to extend their yard further…
Amicus were awarded this project in early 2020 but the start was delayed due to the Covid virus and lockdown. Once works got underway in…
Following very poor weather in the Winter of 2019 a section of the old existing quayside timber retaining structure was washed away risking the loss…
Amicus were appointed to fabricate and install the new access ramps and stairs for access to their new corporate function and mooring facility on the…
These works were a continuation of HHA’s commitment to maintaining the integrity of the pier and involved installing new deck support timbers.
This third pontoon was completed using the same principles as the first two although there were added challenges for this pontoon because it supports the…
Dura Composites main operations base in Telford Road required major improvements and extensions to their external storage areas. Amicus were contracted to excavate and infill…
These works involved improvements to the existing warden’s facility at Landguard Point in Felixstowe including works to the bungalow and garages.
Amicus were approached by FM Conway to advise on a repair proposal for their jetty on the River Thames in Erith which is where they…
This is the second of three pontoons to be refurbished at Ha’Penny Pier. The first pontoon was successfully completed for Easter 2018. This second pontoon…
The pontoons for Woods River Cruises new mooring facility alongside Victoria Embankment were fabricated in Southampton Docks by SMS
Woods River Cruises appointed Amicus to undertake concrete works at their new mooring facility along the Victoria Embankment at Waterloo Bridge. The location provided many…
This project was completed over two phases. Phase 1 was Oct to Dec 2016 and Phase 2 Oct to Dec 2017. This was planned to…
This was a small project for Toppesfield which we managed and delivered for them effectively as main contractor with Toppesfield undertaking the surfacing element. Brookwood…
The clients jetty facility in Harwich operates their fleet of Pilot Boats and utility vessels on a 24/7 basis. They had four gangway access points…
This small project was completed in collaboration with Browne and involved the refurbishment of a New River pedestrian bridge which was in dire need of…
This small project was completed in collaboration with Browne and involved the refurbishment of a New River pedestrian bridge which was in dire need of…
Amicus won this project to repair the rotten and vandalised walkway to this jetty on the beach behind Landguard Fort in Felixstowe.
This was the second phase of the shot blasting and painting of the jetty structural steelwork and piles. This phase was about 2/3 of the…
The client tendered this project based on it being completed over two phases on successive summers. The Launch Jetty is HHA’s key asset to deliver…
This was our first project as Amicus and involved an ambitious programme to deliver a new site access along the busy Parkway dual carriageway in…
Amicus undertook this project for KKB which involved a new road connecting Manor Royal with the A2011 dual carriageway.
We were asked to price and mobilise for this project in the space of a week to ensure the client met their piling commencement date.
We collaborated with Browne on this project to refurbish this bridge over the New River. The bridge was in a bad state of repair and…
For this project we achieved accreditation to RISQS to undertake works adjacent to the railway. This project was an enormous challenge as the site was…
This small scheme required the works to be sensitively planned as it was undertaken within the SSSI area at Landguard Point in Felixstowe. We also…
As part of the upgrade of facilities at the Radar Tower on Landguard Point a new fibre optic supply was required which necessitated a new…
This was another project undertaken for KKB which required a quick mobilisation by the Amicus team.
We commenced this project when the houses were still under construction but no external works had begun. Our package of works included the foul and…
Amicus delivered this essential upgrade project for HHA at their Radar Tower on Landguard Point on time and without unscheduled shutdowns of the radar facility.
The DF (Direction Finder) Tower on Landguard Point had been decommissioned for many years so was surplus to requirements.
This was our very first project for HHA. We were asked to visit site and provide a methodology and price for the replacement of rotten…
This project had to be completed during the school summer holidays and to a strict maximum budget. Amicus worked with the client and design team…
This project was planned over a 12 month period to ensure minimal disruption to HHA’s VHF radio shipping service and follows our successful upgrade of…
This project proved challenging in more ways than one. We commenced the work for Allston as sole subcontractor delivering the site clearance and enabling works…
HHA contracted Amicus to investigate options for the refurbishment of the three steel pontoons at Ha’Penny Pier in Harwich.
This project was for our regular client, Harwich Haven Authority, and involved the preparation and re-painting of the Victorian visitor centre/museum and the café/amenity building…
We were appointed to this project by London Borough of Havering (LBH) as a direct result of our performance at the Lexington Way development where…
Amicus were approached by FM Conway to advise on a repair proposal for their jetty on the River Thames in Erith which is where they…