Outer Pontoon and Ha’Penny Pier Pontoon – Replacement Piles

We have undertaken a number of repair projects on this jetty which is owned and operated by HHA. Previous work has included shotblasting and painting of the steelwork, replacement timber beams and decking, new pontoons and gangway structures. This project was to replace a number of rotten/damaged hardwood deck boards and installation of some hardwood deck beams underneath the decking where we identified issues with rotten existing beams. The jetty was kept operational 24/7 to ensure HHA’s operation was unaffected.

Client:

Harwich Haven Authority

Harwich Haven Authority